Asphalt Paving

First Rate Paving

In preparation for paving, our work crew surveys the entire surface area for cracks and voids. Those areas are cut out (milling off joints). We then apply a rubberized crack filler (Flex-A-Fill) which ensures a proper repair. Finally we install ID#2 asphalt wearing course topping to a compacted thickness of 1.5 inches.

Line Striping

Our line striping is applied by professional painters as you can see from the photos below.

Please Note: Slideshows, Galleries, and Photos contain large images and may take several seconds to load on a slower connection. Please be patient. Thank you.

Slideshows & Photo Galleries

Slideshow Arrow

  1. View slideshow of a completed asphalt driveway

Photos

Click on photos to enlarge

BeforeAfter

Driveway Before Asphalt and Paving

BeforeAfter

Driveway Before Asphalt and Paving

Specials and Discounts

Mention this ad and receive a 3% discount off the quoted price on our submitted proposal.

Our discounts are a limited time offer, so be sure to ask for information on when this offer is in effect.

 

Home | Additions | Asphalt | Basements | Bathrooms | Building | Commercial | Flooring | Roofing | Sunrooms | Contact Us

Berks Commercial Renovations, Ltd.
45 North 23rd Street, Mt. Penn, PA. 19606
Copyright ©